Tuesday 26 January 2016

Sauk Village Public Works Department Report - January 26, 2016


Public Works Report


by Director Kevin Weller




  • Clean up after storm event
  • Repair water main break 22228 Yates
  • Worked on storm sewer blockage related to Pacesetter Steel
  • Received 4 loads of salt 100 tons and put it away
  • HVAC units being worked on at Police Department, Fire Department, Public Works and Village Hall
  • Case cards system being worked on possible electric surg
  • Garbage cans and miner pickup around town
  • Vendors picked up parts for  vehicle ,equipment,and buildings
  • Repaired tools and equipment and vehicles
  • Started shut off list jetted B box 21743 Carol found concrete called in for dig
  • Shut water off for frozen pipes 4 locations
  • Removed tree 1839 223rd St. prep for hydrant replacement
  • Pothole work  complaint locations Pacesetter Steel
  • PD,Transport cars for PD to shops
  • Water plant repairs due to weather
  • PW building work.