Public Works Report
by Director Kevin Weller
- Clean up after storm event
- Repair water main break 22228 Yates
- Worked on storm sewer blockage related to Pacesetter Steel
- Received 4 loads of salt 100 tons and put it away
- HVAC units being worked on at Police Department, Fire Department, Public Works and Village Hall
- Case cards system being worked on possible electric surg
- Garbage cans and miner pickup around town
- Vendors picked up parts for vehicle ,equipment,and buildings
- Repaired tools and equipment and vehicles
- Started shut off list jetted B box 21743 Carol found concrete called in for dig
- Shut water off for frozen pipes 4 locations
- Removed tree 1839 223rd St. prep for hydrant replacement
- Pothole work complaint locations Pacesetter Steel
- PD,Transport cars for PD to shops
- Water plant repairs due to weather
- PW building work.