Wednesday 23 March 2016

Sauk Village Public Works Report - March 22, 2016






Sauk Village Public Works Report


by; Director Kevin Weller



 


 
:  STREET LIGHTS –  Replaced poles from accidents.  22132 Torrence , 22429 Carolina Dr. 1st underground fault will be at 21445 Peterson, next 1601 215pl .  
              

:  DAY TO DAY REGULAR OPERATIONS AND EMERGINCIES -  All job direction changes, dept. ordering ,special seasonal  event prep setup, vender calling  work with all departments and public complaints AND LAST MINUTE CHANGES INCLUDING 5  MARQUEE CHANGES.
  

:  BUILDINGS – Village Hall card system has been repaired . P.D. south door has a  new catch and key pad on order.  C.C Gym floor stripped, waxed, polished, date for C.C. rental side 3/23-24.  In gym bleacher room drywall work continuing , tile work to follow.


  :  POTHOLES/Asphalt – Taking resident calls on potholes. Patched holes with cold patch several locations south side.


 :  WATER - Day to day schedules & EME CALLS. Called in b boxes to be dug for eme, high bills, and demo list .Completing all testing required by IEPA per month. Repaired 4- b boxes/ jetted 4. Stared south side shut off list.  
        

 : GARBAGE – Day to day cleanup. IF YOU SEE ILLIGAL DUMPING PLEASE CALL POLICE, HELP KEEP OUR TOWN CLEAN. Picked up 223st median.


: HYDRANT & VALVE REPAIRS/REPLACEMENT- Next hydrant will be replaced at 22132 Torrence Ave. Start date will be the week of the 28 when Rickover is off for break. THERE WILL BE A BOIL ORDER ISSUED ALL AFFECTED WILL BE NOTIFIED.


 :  VEHICELS/ EQU-   P.W.  is doing its best to keep all vehicles within the department running safe. We are also trying to help each department in there repairs to keep moving forward. Repaired K9 wire harness, replaced wheel bearing trail blazer, had service on ditch mower and dropped off P.D truck at dealer.


: SANITARY SEWER COMPLAINTS –  P.W. received 2 sewer complaints 1 homeowner 1 jetted.
 

:  WEATHER EVENTS -  Due to the high wind events staff will be out cleaning up branches that fell. This is not for regular pickup. 1st regular pickup will start 5/2.
  

: PARKS – Staff started working on  several parks replacing brackets, swings ,chain, and going over each park for future repairs.


:  STREET SIGNS – REPLACED 10 – 20MPH, 4-NO Parking, 2 Street name. Also 5 green post , 8 hanging brackets and misc. materials.